Field
Operation
The
patented cement pulsation process starts immediately
after cement pumping stops and the annular BOP is
closed. Low pressure
pulses, typically in the range of 80 to 200 psi, are applied to the casing
annulus at a time interval of 30 to 60 seconds. Pulsing continues until
the compressible volume levels-off or the laboratory thickening time indicates the cement has reached 70 Bc, usually in 4 to 6 hours.
 Cement Pulsation Equipment
Schematic
|
Equipment
Specifications
- 9'Lx6'Wx8'H
- Weight: 5,300 lbs
- Process Control
- 2 Tank (ASME)
- 200 gallon
- 200 psi working
pressure
- Sensors
- water level
- annulus pressure
- air tanks pressure
- discharge flow

Hydrostatic Pressure Decrease
During the Cement Setting Process
|